Storage and production steel hall with crane. Main frames were produced with a combination of hot-rolled and welded profiles. The design of the Hall included creating it fire resistance for 15 minutes and installing a solar power-plant on the roof.
“It was clear that this project could not be effectively processed without appropriate software equipment. Thanks to Advance Design and Advance Steel, we finished the complete project from structural design – to workshop and arrangement drawings, in two months!” – Ing. Pavel Stibor CEO, Promstall Engineering s.r.o.
The Challenge
The Solution
Users’ Benefits