PEDESTRIANS AND CYCLES FOOTBRIDGE
  • PEDESTRIANS AND CYCLES FOOTBRIDGE
  • PEDESTRIANS AND CYCLES FOOTBRIDGE
  • PEDESTRIANS AND CYCLES FOOTBRIDGE
  • PEDESTRIANS AND CYCLES FOOTBRIDGE
  • PEDESTRIANS AND CYCLES FOOTBRIDGE

The challenge

  • Customization of Advance Steel to match Ets LEGRAND working methods
  • Footbridge with mixed structure in steel/wood,  wooden railing
  • Precise realization and design of different folded parts and supports

The solution

  • Customized drawing styles with a user-defined toolbar to produce the required drawings with dimension styles, line thickness, etc.
  • Interoperability due to a bidirectional link to exchange the 3D model with the company in charge of the wood parts
  • Configuration of the unfolded steel plate based on the criteria of the workshop bender machine

“Advance Steel allowed us to completely move on to 3D design which gave us new opportunities and solutions to architects complex requirements. In addition, the produced documents perfectly match the needs of the workshop and our clients.”

 

Jean-Sébastien COURIVAUD,

Design office Manager at LEGRAND

Users’ benefits

  • Great modeling performances despite the presence of curved elements
  • Time savings in the drawings creation
  • Permanent link between 3D model and all generated documents
  • Architecture office: LEGRAND
  • Location: Annonay, Ardèche, FRANCE
  • Dimensions: Straight span = 40.30m; Strut bar in HEA 200 every 3.40m; 32 tons
  • Specifications: Straight span footbridge with a mixed steel/wood structure, a concrete floor with 2 arches in glue-laminated timber

GRAITEC GROUP 2017 At GRAITEC we take privacy seriously. Please read our privacy policy.