OFFICE BUILDING
  • OFFICE BUILDING
  • OFFICE BUILDING
  • OFFICE BUILDING
  • OFFICE BUILDING

The Challenge

  • Combination of steel, concrete and glass.
  • High demands of the architecture, of the supporting structure, of the building physics and of the fabrication.

The Solution

  • Design, – reinforcement- for steel constructions
  • Provide machine data files for automating the fabrication
  • Consistency of data: model; bill of materials, drawing derivation, machine data.

“Without Advance Steel this project could not have been achieved in this space of time.“

 

Mr. Andreas Spiessberger,

Production developer

at Peneder Service-Consulting GmbH

User’s Benefits

∙ Consistency of data

∙ Machine date for the fabrication

∙ Several excellent functions like NC-files

  • Location: Atzbach, Austria
  • Client: Peneder Immobilien GmbH
  • Specifications: approx. 600 tons of steel;
    Total area: 5.700m2 ; used area: 14.800m2
  • Short description: An office building with integrated training rooms, a restaurant and a hotel.

GRAITEC GROUP 2017 At GRAITEC we take privacy seriously. Please read our privacy policy.