The skywalk is located on a rock at a height of 80m, 2 levels (1 above and 1 over the rock spur), the railings are created with a handrail made out of steel wire ropes.

THE CHALLENGE

· The Weser skywalk had to be constructed at a height of 80m with the use of a specific crane
· Optimization of the prefabricated part
· The main beams are created as a box girder, made of plates welded together at the workshop

THE SOLUTION

· Automatic calculation of the center of gravity for each assembly to help the erection at site
· Exact clarification of details with the construction company using the 3D – modeling
· Tools to easily create plates of shape including weld preparation

“Advance Steel increased our productivity by 50%. We especially appreciated the easy balance point calculation of the construction by crane and the detailed arrangement with the building company due to excellent 3D Modeling. It saved us a lot of time.”
Mr. Mario Fischer
Construction engineer
at BFI Stahlbausysteme GmbH & Co. KG

 

USER‘S BENEFITS

∙ Easy and fast 3D modeling
∙ Fast generation of lists and drawings for fabrication
∙ Automatic calculation of the center of gravity

  • Location: Höxter, Germany
  • Constructor: Thomas & Bäkamp Ingenieurgesellschaft GmbH
  • Dimensions: Total length: 19.38m; Width of level 1: 6.6m; Width
    of level 2: 8.10m; Total area: 70m²